In the first article in this series we followed a gearbox bearing that failed at 02:40 on a Tuesday. On one version of that night, the plant stopped. On the other, the bearing was replaced during Sunday's planned shutdown and nobody noticed. This article puts a rand value on the difference.
The four cost buckets
- Direct loss. Tonnes not produced while the line is down, the emergency repair itself, and the secondary damage a failing bearing does to the shaft, gears and housing when it is allowed to run to destruction. A bearing caught early is a bearing. A bearing caught late is often a gearbox.
- Safety and compliance exposure. Catastrophic failure on rotating plant puts people at risk. After any serious incident, the mine must show what it knew and what it did about it. Missing condition records weaken that position with the inspectorate, with insurers and in any investigation.
- Operational drag. Call-outs at night, overtime, expedited freight on spares, contractors on premium rates, planners rebuilding the week's schedule around an emergency, and downstream equipment starved and restarted.
- Opportunity cost. Missed production targets, penalties or lost credibility with offtakers, and the slow erosion of trust in the maintenance team when breakdowns keep surprising everyone.
A worked model
Every figure below is an assumption for illustration. Replace each one with your own plant's numbers; the arithmetic is what matters.
Assumed site: a processing plant fed by a primary conveyor running at 400 tonnes per hour, with a contribution margin of R150 per tonne. A drive gearbox bearing fails unplanned and the line is down for 18 hours.
| Line item | Assumption | Unplanned failure | Caught early, fixed in planned shutdown |
|---|---|---|---|
| Lost production | 400 t/h × 18 h × R150/t | R1,080,000 | R0 (fixed during scheduled stop) |
| Repair parts | Gearbox rebuild vs bearing set | R420,000 | R28,000 |
| Labour | Emergency call-out and overtime vs planned shift | R65,000 | R12,000 |
| Freight and expediting | Urgent courier of spares | R45,000 | R0 |
| Downstream restart losses | Crusher and mill restart, off-spec product | R80,000 | R0 |
| Total | R1,690,000 | R40,000 |
On these assumptions, the same fault costs roughly forty times more when it is found by breakdown than when it is found by a change in the readings. Your figures will differ. The ratio is the point.
The line items nobody budgets for
- The planner's week lost to rescheduling around the emergency.
- Secondary damage that only shows up months later in a coupling, motor or pulley that took the shock.
- Spares bought at premium because nothing was ordered ahead.
- Time spent after the event reconstructing what happened for a report, an investigation or an insurer.
- The artisan on standby who was called out at 03:00 and is not fully productive the next day.
Cost of inaction vs cost of monitoring
The question is not whether monitoring costs money. It is how many breakdowns it has to prevent to pay for itself. Platforms in this category start from around R350 per month ex VAT for the software, with the sensors and gateway priced for your site. Against a single stoppage of the size modelled above, the software cost for several years is a rounding error. Even if monitoring only turns one breakdown a year into a planned repair, the arithmetic is rarely close.
What changes over 12 months
| Period | What you should expect | What to measure |
|---|---|---|
| Month 1 | Sensors installed on critical assets; normal readings established; limits agreed with your maintenance engineer | Every critical asset has a baseline and a limit |
| Month 6 | First changes caught and converted into planned work; limits refined to cut false alarms | Breakdowns vs planned repairs on monitored assets |
| Month 12 | A full year of readings and faults per asset; maintenance planned on condition, not on the calendar alone | Unplanned stoppage hours vs the year before |
Track these against your own baseline from before monitoring started. That comparison, not an industry average, is the number that will convince your finance team.
Frequently asked questions
How much does unplanned downtime cost a mine?
It depends on throughput, margin and repair scope. Multiply tonnes per hour by hours down by margin per tonne, then add parts, labour, freight and restart losses. The worked model above shows the method.
Is planned maintenance really cheaper than reactive maintenance?
Usually, because a failure caught early limits the damage to one component and is fixed during a scheduled stop. Run to failure, the same fault often destroys surrounding parts and stops production.
What should we monitor first?
The machines where a failure stops the most production or creates the most risk: primary conveyors, crushers, mill drives, critical pumps and fans.
Let us model your plant
Send us your throughput, margin and critical asset list, and we will work out the cost of downtime for your plant with you.
Next in this series: how to choose condition monitoring sensors for mining and heavy industry.